Construction scheduled at the blue heron bridge :?(

Recommended Posts

Gary,

 

The small bridge is the eastern bridge. The fishing pier is under the large western bridge.

 

Here is a notice posted on the DOT website.

 

Little Blue Heron Bridge Replacement Project Open House

District: Four

Meeting Type: Meeting

Date: Wednesday, August 19, 2009

Time: 4:00 pm to 8:00 pm

Location Name: Palm Beach Shores Town Hall

Street Address: 214 Edwards Lane

City: Palm Beach Shores FL 33404

Directions: map showing meeting location

Purpose:

The Florida Department of Transportation (FDOT) will host an Open House to inform the community about the upcoming Little Blue Heron Bridge Replacement Project.

 

The project includes removing and replacing the existing low level bridge on Blue Heron Boulevard/State Road A1A near Phil Foster Park. Construction will begin this fall and last approximately one year.

 

The Open House will provide attendees with information about the scope of work, construction schedule and maintenance of traffic for this project. The Open House will have an informal format. No formal presentation will be made. FDOT and project representatives will be available throughout the Open House to discuss the project and answer questions one-on-one.

 

Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status.

 

If you need special accommodations under the Americans with Disabilities Act, require translation services (free of charge) or would like further information about this project or Open House, please contact Public Information Officer Tish Burgher by phone at 561-640-6441 or by e-mail at Tish@QCAusa.com

Primary Contact: Tish Burgher

Primary Phone: 561-640-6441

Primary E-Mail: Tish@QCAusa

Additional Contact: FDOT District Four Public Information Office

Additional Phone: Toll Free 866-336-8435 ext. 4090

Additional E-mail: barbara.kelleher@dot.state.fl.us

Expires: 8/20/2009

 

 

If this goes forward without extreme efforts to curb the environmental impact the damage might be significant. I'm not local but just caught wind of this yesterday. I'm not sure what we (those out of state, country etc) can do to help prevent this from moving forward without a further study of what the impact might be. Anyway, I thought I'd post this here for information purposes.

Share this post


Link to post
Share on other sites
If this goes forward without extreme efforts to curb the environmental impact the damage might be significant. I'm not local but just caught wind of this yesterday. I'm not sure what we (those out of state, country etc) can do to help prevent this from moving forward without a further study of what the impact might be. Anyway, I thought I'd post this here for information purposes.

 

Hi Gary,

 

Where did you find this?

 

I'd like to re-post it on some of our local forums.

 

Thanks

Tony

Share this post


Link to post
Share on other sites
http://www2.dot.state.fl.us/publicsyndicat...tings_district4

 

 

Scroll Down and you'll find it on the list for district 4

 

Thank you for posting this. I have dove under the Blue Heron Bridge (both the east and west sides) several times - actually doing a night dive this coming saturday. Its a great dive for those fortunate enough to live nearby.

Share this post


Link to post
Share on other sites
Thank you for posting this. I have dove under the Blue Heron Bridge (both the east and west sides) several times - actually doing a night dive this coming saturday. Its a great dive for those fortunate enough to live nearby.

 

Is construction starting anytime soon? I'm thinking of trying to go there when I'm in Florida the third week of November.

Share this post


Link to post
Share on other sites

You might pop over to www.digitaldiver.net and PM a guy called fisheye. He lives pretty close and can give you the updated conditions. From what I understand they're containing the construction pretty well and the macro sites haven't really been affected that much.

Share this post


Link to post
Share on other sites
Sign in to follow this  

Sponsors

Advertisements



×
×
  • Create New...